JDL Portfolio
Explore Our Proven Track Record of Excellence—See How JDL Refrigeration Has Delivered Comfort, Efficiency, and Reliability to Homes and Businesses Across East Valley.
Trane 14 SEER Package Heat Pump Installation
We replaced an aging unit with a new Trane 14 SEER package heat pump to enhance energy efficiency and comfort. The project involved custom modifications to fit the new system perfectly and ensure long-lasting performance.
Our Job:
- Removed old unit and installed a new custom curb.
- Provided and installed Trane TWCC4036 14 SEER package heat pump.
- Insulated the curb with a 1" liner for energy efficiency.
- Fabricated a custom transition to fit the existing setup.
- Installed a new 60 AMP disconnect and time delay fuses.
- Added new PVC condensate lines for drainage.
- Coordinated 2 crane lifts for precise placement of the equipment.
- Disposed of old equipment according to city codes.
- Provided a 10-year warranty on the compressor, parts, and 2-year labor warranty.
5-Ton, 15 SEER Split Heat Pump System Installation
JDL Refrigeration upgraded an existing residential heating and cooling system to a high-efficiency 5-ton split heat pump, improving the home’s year-round climate control and energy savings.
Our Job:
- Installed a 5-ton, 15 SEER split heat pump.
-
Model Numbers:
Condenser: M#4TWR5060N1000 Air Handler: M#TEM6BOC60S1S - Ensured installation met all manufacturer specs and local codes.
Trane 14 SEER Split System Heat Pump Installation
Our team successfully installed three Trane 14 SEER split-system heat pumps to replace outdated units, providing enhanced energy savings and climate control for this property.
Our Job:
- Installed 3 Trane 14 SEER split system heat pumps.
- Provided a 10-year warranty on parts, labor, and the compressor.
Industrial Marijuana Grow Facility Retrofit
For this large-scale industrial marijuana grow facility, we upgraded the entire cooling system, removing smaller units and installing state-of-the-art large-capacity cooling units.
Our Job:
- Removed 27 existing 5- and 10-ton units.
- Installed 9 60-ton Aaon units with custom curb cut-ins.
- Designed and built complete duct systems to accommodate the new units.
- Managed over $1 million in equipment and ensured optimal performance.
Evaporative Coolers to Air Conditioning Retrofit
This light industrial project involved transitioning from evaporative coolers to a modern air conditioning system, significantly improving working conditions without disrupting roof integrity.
Our Job:
- Switched from evaporative coolers to air conditioning.
- Installed new units with no roof penetrations.
- Ensured minimal downtime, allowing the team to work in air-conditioned spaces within a few days.